California Hall Content / California Hall Content for 麻豆传媒 en New Lecture Hall on the (California Ave.) Block /news/new-lecture-hall-block <p>麻豆传媒 has a new king of the lecture halls: California Hall, accommodating nearly 600 students, opened Monday morning (Jan. 7) with the start of the winter quarter.</p> <p>The hall (room number 1100) on California Avenue is surrounded by Hutchison, Asmundson, Kerr, Robbins and Haring halls in the campus core.</p> <p>The project that began with groundbreaking in June 2016 represents the campus鈥檚 first significant addition of classroom space in more than a decade.</p> January 08, 2019 - 2:25pm Dave Jones /news/new-lecture-hall-block Construction Projects Keep Crews Busy Over Summer /news/construction-projects-keeping-crews-busy-over-summer <p>The colors have been chosen for the squat racks, windows are going in and soon a crane will lower a large container into the courtyard 鈥� a container that will not only be used for storage of outdoor fitness equipment, but is itself a piece of fitness equipment.</p> July 24, 2018 - 9:00am Cody Kitaura /news/construction-projects-keeping-crews-busy-over-summer NEWS BRIEFS: 鈥楲arge Lecture Hall鈥� Given 鈥楥alifornia鈥� Name /news/news-briefs-large-lecture-hall-given-california-name <p>The process of building 麻豆传媒鈥� new lecture hall has progressed like most other construction projects, but it will be unlike any other space on campus once it鈥檚 finished.</p> <p>California Hall, as it鈥檚 now called, <a href="/news/much-needed-lecture-hall-will-seat-600-2018">will include nearly 600 seats</a> and a bevy of new technology when it opens in winter quarter. The $22 million building between Hutchison Hall and California Avenue is 麻豆传媒鈥� first significant new classroom space in a decade, designed to help meet enrollment growth.</p> April 17, 2018 - 10:31am Dave Jones /news/news-briefs-large-lecture-hall-given-california-name Much-Needed Lecture Hall Will Seat 600 in 2018 /news/campus-breaks-ground-large-lecture-hall <p>Students are about to get a lot more space to learn.</p> <p>Campus officials broke ground June 3 on <a href="/node/45408">a 600-seat lecture hall to be situated between Hutchison Hall and California Avenue</a>. The $22 million building is scheduled for completion in January 2018.</p> <p>鈥淎 groundbreaking for a facility like this, which is so needed and is going to be so vibrantly used, is always an occasion for celebration,鈥� Acting Chancellor Ralph J. Hexter said. 鈥淚t will help us as we schedule large classes and ensure that there are no bottlenecks on the pathway to graduation.鈥�</p> June 07, 2016 - 9:00am Cody Kitaura /news/campus-breaks-ground-large-lecture-hall 麻豆传媒 to Break Ground for Large Lecture Hall /news/uc-davis-break-ground-large-lecture-hall <h2>What</h2> <figure role="group" class="caption caption-drupal-media align-right"> <div class="media media--type-sf-image-media-type media--view-mode-default"> <img loading="lazy" src="/sites/default/files/news/general-news/2016/may/lecturehallrendering.jpg" width="360" height="203" alt="A rendering of the exterior of a large building" typeof="Image"> </div> <figcaption>The large lecture hall will accommodate up to 600 students.</figcaption> </figure> <p>麻豆传媒 will celebrate the groundbreaking for a <a href="http://dcm.ucdavis.edu/projects/lecturehall/index.html"></a></p> June 02, 2016 - 4:00pm Julia Ann Easley /news/uc-davis-break-ground-large-lecture-hall